|
 | (* DENOTES DELAYS ARE EXPECTED) |   |   |   |
County Line Rd., Upper Moreland, Lower Moreland twps. | Paving: CLOSED & DETOURED between Second St. & James Way. 7 PM - 6 AM. DETOUR POSTED. |  6/4/13-6/6/13 |  Bucks County Water & Sewer Authority |   |
Blair Mill Rd., Horsham, Upper Moreland twps. | Utillity Installation: CLOSED & DETOURED between Moreland Ave. & County Line Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED. |  6/3/13-8/30/13 |  Aqua Pennsylvania |   |
County Line Rd., Upper Moreland, Lower Moreland twps. | Paving: CLOSED & DETOURED between Pine St. & Second St. 7 PM - 6 AM. DETOUR POSTED. |  5/31/13-6/3/13 |  Bucks County Water & Sewer Authority |   |
PA 29 (Gravel Pike)/PA 73 (Skippack Pike), Schwenksville Bor. | Utility Installation: LANE RESTRICTIONS between Maple St. & Perkiomen Ave. 9 AM - 3 PM. |  5/28/13-5/31/13 |  Schwenksville Borough Authority |   |
Kulp Rd., Lower Salford Twp. | Utility Installation: LANE RESTRICTIONS between Yoder Rd. & School House Rd. 9 AM - 3 PM. |  5/24/13 & 5/28/13 |  PECO Energy |   |
County Line Rd.,Upper Moreland, Lower Moreland twps. | Paving: LANE CLOSURE between James Way & Centennial Rd. 7 PM - 6 AM. |  5/23/13-5/30/13 |  Bucks County Water & Sewer Authority |   |
Glenside Ave., Cheltenham Twp. | Bridge Inspection: LANE CLOSURE between Greenwood Ave. & Church Rd. 9 AM - 3 PM |  5/22/2013 |  Specialty Engineering, Inc. |   |
*I-76 East, Lower Merion Twp. | Bridge Inspection: RIGHT LANE CLOSED between Righters Ferry Rd. & Belmont Ave. 9 AM - 3 PM. |  5/21/2013 |  Specialty Engineering, Inc. |   |
Crawford Ave., West Conshohocken Bor. | Curb Ramp Reconstruction: LANE RESTRICTION at Moorehead Ave. 7 AM - 5 PM. |  5/20/13-5/22/13 |  Allan A. Myers |  $9.5 million |
Front St., West Conshohocken Bor. | Curb Ramp Reconstruction: LANE RESTRICTIONS at Matsonford Rd. & William St. 7 AM - 5 PM. |  5/20/13-5/22/13 |  Allan A. Myers |  $9.5 million |
PA 611 (Easton Rd.), Upper Moreland Twp. | Utility Installation: LANE CLOSURE between Maryland Rd. & Wyandotte Rd. 9 AM - 3 PM. |  5/20/13-5/24/13 |  Pennsylvania Turnpike Commission |   |
Red Lion Rd., Lower Moreland Twp. | Utility Installation: CLOSED & DETOURED between Philmont Ave. & Pine Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED. |  5/20/13-7/19/13 |  Aqua Pennsylvania |   |
US 202, Upper Merion Twp. | Road Construction: ONE LANE CLOSED between Henderson Rd. & Town Center Rd. 9 AM - 3 PM. |  5/20/13-7/28/13 |  Valley Forge Center Association |   |
*I-76 E & W., Lower Merion Twp. | Sweeping: SHOULDER CLOSURE between Conshohocken & US 1/City Ave. Interchanges. 9 AM - 3 PM. |  5/20/13-5/24/13 |  Maintenance |   |
*I-76 West, Lower Merion Twp. | Bridge Inspection: RIGHT LANE CLOSED between Righters Ferry Rd. & Belmont Ave. 9 AM - 3 PM. |  5/20/2013 |  Specialty Engineering, Inc. |   |
Old Forty Foot Rd., Skippack, Towamencin twps. | Paving: CLOSED & DETOURED between Township Line Rd. & Old Morris Rd. 8 PM - 5 AM. DETOUR POSTED. |  5/19/13-5/22/13 |  Allan A. Myers |  $12.3 million |
*PA 23 (Front St.), W. Conshohocken Bor. | Paving: LANE CLOSURE between PA 320 (Swedeland Rd.) & Matsonford Rd. 7 AM - 5 PM. |  5/18/2013 |  Loftus Construction, Inc. |  $4.8 million |
Lincoln Ave., Upper Moreland Twp. | Utility Installation: LANE RESTRICTION at York Rd. 9 AM - 3 PM. |  5/14/13-6/14/13 |  501 York Associates |   |
Susquehanna Rd., Abington Twp. | Utility Installation: CLOSED & DETOURED between Highland Ave. & Huntingdon Rd. 7 PM - 5 AM. DETOUR POSTED. |  5/13/13-7/15/13 |  PECO Energy |   |
Warminster Rd., Hatboro, Upper Moreland twps. | Utility Installation: CLOSED & DETOURED between PA 263 (York Rd). & Byberry Rd. Weekdays 9 AM - 3 PM. DETOUR POSTED. |  5/13/13-8/9/13 |  Aqua Pennsylvania |   |
*US 422 East, Lower Pottsgrove Twp. | Road Construction: LANE CLOSURE between PA 724 (Schuylkill Rd.) & Sanatoga Interchanges. 5 PM - 5 AM. |  5/6/13-5/31/13 |  J.D. Eckman, Inc. |  $73.3 million |
*US 422 West, Lower Pottsgrove Twp. | Road Construction: LANE CLOSURE between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7 PM - 1 PM. |  5/6/13-5/31/13 |  J.D. Eckman, Inc. |  $73.3 million |
Fretz Rd., Lower Salford Twp. | Bridge Replacement: CLOSED & DETOURED between Cassell Rd. & Yoder Rd. 24-HOUR RD. DETOUR POSTED. |  5/3/13-11/15/13 |  Pennsylvania Turnpike Commission |   |
Jenkintown Rd., Abington Twp. | Utility Installation: CLOSED & DETOURED between Cedar Rd. & Township Line Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED. |  4/29/13-7/17/13 |  Aqua Pennsylvania |   |
S. Main St., Hatfield Bor, | Curb Replacement: LANE RESTRICTIONS between Poplar St. & Orvilla Rd. 7 AM - 4 PM. |  4/23/13-5/24/13 |  Hatfield Borough Authority |   |
Bala Ave., Lower Merion Twp. | Streetscape Construction: LANE RESTRICTIONS between City Ave. & Balwyn Place. 9 AM - 3 PM. |  4/22/13-9/10/13 |  Marino Corporation |  239953.4 |
Main St., Norristown Bor. | Bridge Rehabilitaton: LANE RESTRICTION between Markley St. & Astor St. 9 AM - 3 PM. |  4/22/13-10/2014 |  J.D. Eckman |  $20.8 million |
Bryn Mawr Ave., Lower Merion Twp. | Utility Installation: LANE RESTRICTIONS between US 30 (Lancaster Ave.) & Old Lancaster Ave. 9 AM - 3 PM. |  4/9/13-6/7/13 |  Aqua Pennsylvania |   |
Church Rd., Upper Merion Twp. | Utility Installation: CLOSED & DETOURED between S. Gulph Rd. & Gulph Ridge Drive. Weekdays 9 AM - 3 PM. DETOUR POSTED. |  3/26/13-8/19/13 |  Aqua Pennsylvania |   |