PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
ENGINEERING DISTRICT 6-0
TRAFFIC RESTRICTION BULLETIN


(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)
(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

For current traffic and travel conditions, visit 511PA

PENNDOT ROADWAY MAINTENANCE HOTLINE: 1-800-FIX- ROAD

[PHILADELPHIA]    [BUCKS]    [CHESTER]    [DELAWARE]    [MONTGOMERY]   [ALL


previous next
(* DENOTES DELAYS ARE EXPECTED)      
County Line Rd., Upper Moreland, Lower Moreland twps.Paving: CLOSED & DETOURED between Second St. & James Way. 7 PM - 6 AM. DETOUR POSTED.  6/4/13-6/6/13  Bucks County Water & Sewer Authority  
Blair Mill Rd., Horsham, Upper Moreland twps.Utillity Installation: CLOSED & DETOURED between Moreland Ave. & County Line Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.  6/3/13-8/30/13  Aqua Pennsylvania  
County Line Rd., Upper Moreland, Lower Moreland twps.Paving: CLOSED & DETOURED between Pine St. & Second St. 7 PM - 6 AM. DETOUR POSTED.  5/31/13-6/3/13  Bucks County Water & Sewer Authority  
PA 29 (Gravel Pike)/PA 73 (Skippack Pike), Schwenksville Bor.Utility Installation: LANE RESTRICTIONS between Maple St. & Perkiomen Ave. 9 AM - 3 PM.  5/28/13-5/31/13  Schwenksville Borough Authority  
Kulp Rd., Lower Salford Twp.Utility Installation: LANE RESTRICTIONS between Yoder Rd. & School House Rd. 9 AM - 3 PM.  5/24/13 & 5/28/13  PECO Energy  
County Line Rd.,Upper Moreland, Lower Moreland twps.Paving: LANE CLOSURE between James Way & Centennial Rd. 7 PM - 6 AM.  5/23/13-5/30/13  Bucks County Water & Sewer Authority  
Glenside Ave., Cheltenham Twp.Bridge Inspection: LANE CLOSURE between Greenwood Ave. & Church Rd. 9 AM - 3 PM  5/22/2013  Specialty Engineering, Inc.  
*I-76 East, Lower Merion Twp.Bridge Inspection: RIGHT LANE CLOSED between Righters Ferry Rd. & Belmont Ave. 9 AM - 3 PM.  5/21/2013  Specialty Engineering, Inc.  
Crawford Ave., West Conshohocken Bor.Curb Ramp Reconstruction: LANE RESTRICTION at Moorehead Ave. 7 AM - 5 PM.  5/20/13-5/22/13  Allan A. Myers  $9.5 million
Front St., West Conshohocken Bor. Curb Ramp Reconstruction: LANE RESTRICTIONS at Matsonford Rd. & William St. 7 AM - 5 PM.  5/20/13-5/22/13  Allan A. Myers  $9.5 million
PA 611 (Easton Rd.), Upper Moreland Twp.Utility Installation: LANE CLOSURE between Maryland Rd. & Wyandotte Rd. 9 AM - 3 PM.  5/20/13-5/24/13  Pennsylvania Turnpike Commission  
Red Lion Rd., Lower Moreland Twp.Utility Installation: CLOSED & DETOURED between Philmont Ave. & Pine Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.  5/20/13-7/19/13  Aqua Pennsylvania  
US 202, Upper Merion Twp.Road Construction: ONE LANE CLOSED between Henderson Rd. & Town Center Rd. 9 AM - 3 PM.  5/20/13-7/28/13  Valley Forge Center Association  
*I-76 E & W., Lower Merion Twp.Sweeping: SHOULDER CLOSURE between Conshohocken & US 1/City Ave. Interchanges. 9 AM - 3 PM.  5/20/13-5/24/13  Maintenance  
*I-76 West, Lower Merion Twp.Bridge Inspection: RIGHT LANE CLOSED between Righters Ferry Rd. & Belmont Ave. 9 AM - 3 PM.  5/20/2013  Specialty Engineering, Inc.  
Old Forty Foot Rd., Skippack, Towamencin twps.Paving: CLOSED & DETOURED between Township Line Rd. & Old Morris Rd. 8 PM - 5 AM. DETOUR POSTED.  5/19/13-5/22/13  Allan A. Myers  $12.3 million
*PA 23 (Front St.), W. Conshohocken Bor.Paving: LANE CLOSURE between PA 320 (Swedeland Rd.) & Matsonford Rd. 7 AM - 5 PM.   5/18/2013  Loftus Construction, Inc.  $4.8 million
Lincoln Ave., Upper Moreland Twp.Utility Installation: LANE RESTRICTION at York Rd. 9 AM - 3 PM.  5/14/13-6/14/13  501 York Associates  
Susquehanna Rd., Abington Twp.Utility Installation: CLOSED & DETOURED between Highland Ave. & Huntingdon Rd. 7 PM - 5 AM. DETOUR POSTED.  5/13/13-7/15/13  PECO Energy  
Warminster Rd., Hatboro, Upper Moreland twps.Utility Installation: CLOSED & DETOURED between PA 263 (York Rd). & Byberry Rd. Weekdays 9 AM - 3 PM. DETOUR POSTED.  5/13/13-8/9/13  Aqua Pennsylvania  
*US 422 East, Lower Pottsgrove Twp.Road Construction: LANE CLOSURE between PA 724 (Schuylkill Rd.) & Sanatoga Interchanges. 5 PM - 5 AM.  5/6/13-5/31/13  J.D. Eckman, Inc.  $73.3 million
*US 422 West, Lower Pottsgrove Twp.Road Construction: LANE CLOSURE between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7 PM - 1 PM.  5/6/13-5/31/13  J.D. Eckman, Inc.  $73.3 million
Fretz Rd., Lower Salford Twp.Bridge Replacement: CLOSED & DETOURED between Cassell Rd. & Yoder Rd. 24-HOUR RD. DETOUR POSTED.  5/3/13-11/15/13  Pennsylvania Turnpike Commission  
Jenkintown Rd., Abington Twp.Utility Installation: CLOSED & DETOURED between Cedar Rd. & Township Line Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.  4/29/13-7/17/13  Aqua Pennsylvania  
S. Main St., Hatfield Bor,Curb Replacement: LANE RESTRICTIONS between Poplar St. & Orvilla Rd. 7 AM - 4 PM.  4/23/13-5/24/13  Hatfield Borough Authority   
Bala Ave., Lower Merion Twp.Streetscape Construction: LANE RESTRICTIONS between City Ave. & Balwyn Place. 9 AM - 3 PM.  4/22/13-9/10/13  Marino Corporation  239953.4
Main St., Norristown Bor.Bridge Rehabilitaton: LANE RESTRICTION between Markley St. & Astor St. 9 AM - 3 PM.  4/22/13-10/2014  J.D. Eckman  $20.8 million
Bryn Mawr Ave., Lower Merion Twp.Utility Installation: LANE RESTRICTIONS between US 30 (Lancaster Ave.) & Old Lancaster Ave. 9 AM - 3 PM.  4/9/13-6/7/13  Aqua Pennsylvania  
Church Rd., Upper Merion Twp.Utility Installation: CLOSED & DETOURED between S. Gulph Rd. & Gulph Ridge Drive. Weekdays 9 AM - 3 PM. DETOUR POSTED.  3/26/13-8/19/13  Aqua Pennsylvania  



previous next