| SECTION 101 - ABBREVIATIONS AND DEFINITIONS OF TERMS |
| . | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 7/31/98 | 9/4/98 |
| . | . | . | . |
| SECTION 102 - BIDDING REQUIREMENTS AND CONDITIONS |
| . | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
| . | | 7/31/98 | 9/4/98 |
| . | | 6/18/98 | 7/10/98 |
| . | | 10/1/97 | 12/11/97 |
| .. | . | . | . |
| SECTION 103 - AWARD AND EXECUTION OF CONTRACT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
| ... | | 7/31/98 | 9/4/98 |
| ... | | 6/18/98 | 7/10/98 |
| ... | ... | ... | ... |
| SECTION 104 - SCOPE OF WORK |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 11-7-97 | 1-8-98 |
| ... | ... | ... | ... |
| SECTION 105 - CONTROL OF WORK |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/9/97 | 9/10/97 |
| .. | | 11/12/96 | 1/29/97 |
| .. | | 3/13/96 | 5/8/96 |
| ... | ... | ... | ... |
| SECTION 106 - CONTROL OF MATERIAL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 2/14/97 | 5/7/97 |
| ... | | 7/1/96 | 9/18/96 |
| ... | ... | ... | ... |
| SECTION 107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
| .. | | 10/19/98 | 2/26/99 |
| .. | | 10/1/97 | 10/1/97 |
| .. | | 8/25/97 | 11/5/97 |
| .. | | 11/12/96 | 1/29/97 |
| .. | | 3/13/96 | 5/8/96 |
| ... | ... | ... | ... |
| SECTION 108 - PERFORMANCE AND PROGRESS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 3/13/96 | 5/8/96 |
| ... | ... | ... | ... |
| SECTION 110 - PAYMENT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 10/13/99 | 12/31/99 |
| .. | | 7/30/99 | 10/22/99 |
| ... | | 6/18/98 | 7/10/98 |
| ... | | 11/10/97 | 1/8/98 |
| ... | | 10/17/97 | 1/8/98 |
| ... | | 3/13/96 | 5/8/96 |
| ... | ... | ... | ... |
| SECTION 111 - DELAY CLAIMS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 9/16/96 | 12/11/96 |
| .. | .. | .. | .. |
| SECTION 201 - CLEARING AND GRUBBING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| .. | .. | .. | .. |
| SECTION 203 - CLASS 1, CLASS 1A, AND CLASS 1B EXCAVATION |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| ... | | 7/17/97 | 9/25/97 |
| ... | | 7/1/96 | 9/18/96 |
| ... | ... | ... | ... |
| SECTION 305 - BITUMINOUS CONCRETE BASE COURSE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
| ... | | 7/16/98 | 9/18/98 |
| ... | | 9/30/96 | 12/11/96 |
| ... | | 3/13/96 | 3/13/96 |
| ... | ... | ... | ... |
| SECTION 320 - AGGREGATE-BITUMINOUS BASE COURSE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 321 - AGGREGATE - CEMENT BASE COURSE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 341 - COLD RECYCLED BITUMINOUS BASE COURSE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 401 - CONVENTIONAL SPECIFICATIONS, PLANT-MIXED BITUMINOUS CONCRETE COURSES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | | 8/21/98 | 11/13/98 |
| ... | | 7/16/98 | 9/18/98 |
| ... | | 6/23/98 | 9/4/98 |
| ... | | 5/19/97 | 7/30/97 |
| ... | | 9/30/96 | 12/11/96 |
| ... | | 3/13/96 | 3/13/96 |
| ... | ... | ... | ... |
| SECTION 402 - GENERAL RESTRICTED PERFORMANCE SPECIFICATION, PLANT-MIX COURSES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 8/21/98 | 11/13/98 |
| .. | | 5/19/97 | 7/30/97 |
| .. | | 9/30/96 | 12/11/96 |
| .. | | 3/13/96 | 3/13/96 |
| ... | ... | ... | ... |
SECTION 420 - BITUMINOUS WEARING COURSE ID-2 (STANDARD),
BITUMINOUS WEARING COURSE ID-2 (HEAVY DUTY),
BITUMINOUS WEARING COURSE ID-2, RPS (STANDARD),
AND BITUMINOUS WEARING COURSE ID-2, RPS (HEAVY DUTY) |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| ... | | 7/16/98 | 9/18/98 |
| ... | | 9/30/96 | 12/11/96 |
| ... | | 3/13/96 | 3/13/96 |
| ... | ... | ... | ... |
SECTION 421 - BITUMINOUS BINDER COURSE ID-2 (STANDARD),
BITUMINOUS BINDERCOURSE ID-2 (HEAVY DUTY),
BITUMINOUS BINDER COURSE ID-2, RPS (STANDARD),
AND BITUMINOUS BINDER COURSE ID-2, RPS (HEAVY DUTY) |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 9/30/96 | 12/11/96 |
| .. | | 3/13/96 | 3/13/96 |
| ... | ... | ... | ... |
| SECTION 422 - BITUMINOUS WEARING COURSE FJ-1 AND BITUMINOUS WEARING COURSE FJ-1C |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
SECTION 424 - BITUMINOUS WEARING COURSE ID-3 (STANDARD),
BITUMINOUS WEARING COURSE ID-3 (HEAVY DUTY),
BITUMINOUS WEARING COURSE ID-3, RPS (STANDARD),
AND BITUMINOUS WEARING COURSE ID-3, RPS (HEAVY DUTY) |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 9/30/96 | 12/11/96 |
| .. | | 3/13/96 | 3/13/96 |
| ... | ... | ... | ... |
| SECTION 430 - BITUMINOUS WEARING COURSE FB-2 |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 439 - BITUMINOUS WEARING COURSE FB-1 |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 460 - BITUMINOUS TACK COAT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 6/23/97 | 8/27/97 |
| ... | ... | ... | ... |
| SECTION 461 - BITUMINOUS PRIME COAT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 467 - HEAVY DUTY MEMBRANES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 468 - FIBERIZED ASPHALT MEMBRANE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 469 - ASPHALT JOINT AND CRACK SEALING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| ... | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 470 - BITUMINOUS SEAL COAT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ..... | | 7/16/98 | 9/18/98 |
| ... |  |  |  |
| SECTION 471 - BITUMINOUS SEAL COAT USING PRECOATED AGGREGATE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ..... | | 7/16/98 | 9/18/98 |
| ... |  |  |  |
| SECTION 482 - SLURRY SEAL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... |  |  |  |
| SECTION 501 - REINFORCED OR PAIN CEMENT CONCRETE PAVEMENTS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | | 11/21/97 | 11/21/97 |
| ... | | 10/1/97 | 12/4/97 |
| ... | | 9/18/97 | 12/4/97 |
| ... | | 1/24/97 | 3/12/97 |
| ... | | 12/31/96 | 2/12/97 |
| ... | | 3/13/96 | 3/13/96 |
| ... |  |  |  |
| SECTION 504 - PAVEMENT RELIEF JOINT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
... | | 7/16/98 | 9/18/98 |
| ... |  |  |  |
| SECTION 506 - REINFORCED OR PLAIN CEMENT CONRETE PAVEMENTS, R.P.S. |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 5/11/98 | 6/26/98 |
| ... | | 8/18/97 | 8/18/97 |
| ... |  |  |  |
| SECTION 507 - EVALUATION AND PAYMENT OF R.P.S. CONCRETE PAVEMENT RIDE QUALITY |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 5/11/98 | 6/26/98 |
| ... | ... | ... | ... |
| SECTION 512 - LONGITUDINAL JOINT CLEANING AND SEALING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | ... | ... | ... |
| SECTION 513 - JOINT REHABILITATION |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | ... | ... | ... |
| SECTION 515 - SAWING AND SEALING OF BITUMINOUS OVERLAYS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| ... | ... | ... | ... |
| SECTION 516 - CONCRETE PAVEMENT PATCHING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | | 7/1/96 | 9/18/96 |
| ... | ... | ... | ... |
| SECTION 518 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | ... | ... | ... |
| SECTION 521 - TRANSVERSE JOINT CLEANING AND SEALING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | ... | ... | ... |
| SECTION 523 - PAVEMENT -SHOULDER JOINT SEALING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| .. | | 7/16/98 | 9/18/98 |
| ... | ... | ... | ... |
| SECTION 524 -THIN BONDED PORTLAND CEMENT CONCRETE OVERLAY |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| .. | .. | .. | .. |
| SECTION 525 - CONCRETE PAVEMENT SPALL REPAIR |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/17/97 | 9/25/97 |
| ... | ... | ... | ... |
| SECTION 590 - CRACK CLEANING AND SEALING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/30/99 | 10/22/99 |
| ... | ... | ... | ... |
| SECTION 601 - PIPE CULVERTS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ...... | | 7/30/99 | 10/22/99 |
| ...... | | 3/30/98 | 5/22/98 |
| ... | | 12/16/97 | 2/12/98 |
| ... |  |  |  |
| SECTION 603 - METAL PLATE CULVERTS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... |  |  |  |
| SECTION 605 - ENDWALLS, INLETS, MANHOLES, AND SPRING BOXES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 1/28/99 | 4/22/99 |
| ... | | 10/14/97 | 12/18/97 |
| ... |  |  |  |
| SECTION 609 - INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ..... | | 3/13/96 | 4/24/96 |
| ... |  |  |  |
| SECTION 610 - PIPE UNDERDRAIN AND PAVEMENT BASE DRAIN |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 12/31/96 | 2/12/97 |
| ... |  |  |  |
| SECTION 615 - SUBSURFACE DRAIN OUTLETS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 12/31/96 | 2/12/97 |
| ...... |  |  |  |
| SECTION 619 - PERMANENT IMPACT ATTENUATING DEVICES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
 | | 11/23/99 | 2/25/00 |
 |  |  |  |
| SECTION 621 - METAL MEDIAN BARRIER |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
... | | 7/16/98 | 9/18/98 |
| ...... |  |  |  |
| SECTION 622 - CONCRETE GLARE SCREEN |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 5/15/98 | 7/10/98 |
| ... | | 11/17/97 | 1/29/98 |
| ...... |  |  |  |
| SECTION 623 - CONCRETE MEDIAN BARRIER |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 1/28/99 | 4/22/99 |
| .. | | 5/15/98 | 7/10/98 |
| .. | | 12/13/96 | 2/12/97 |
| ...... |  |  |  |
| SECTION 627 - TEMPORARY CONCRETE BARRIER |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 12/13/96 | 2/12/97 |
| ...... |  |  |  |
| SECTION 629 - CONCRETE TRAFFIC SEPARATOR |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 4/21/98 | 7/10/98 |
| ...... |  |  |  |
| SECTION 636 - BITUMINOUS CONCRETE CURB |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ...... |  |  |  |
| SECTION 640 - PLAIN CEMENT CONCRETE GUTTER |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ...... |  |  |  |
| SECTION 658 - CONCRETE SHOULDERS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 10/17/97 | 1/8/98 |
| ...... |  |  |  |
| SECTION 660 - MILLED SHOULDER RUMBLE STRIPS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ...... | | 4/21/98 | 7/10/98 |
| ... | | 10/17/97 | 1/8/98 |
| ...... |  |  |  |
| SECTION 676 - CEMENT CONCRETE SIDEWALKS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 6/23/98 | 9/4/98 |
| ...... |  |  |  |
| SECTION 680 - WATERPROOFING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .... | | 10/13/99 | 12/31/99 |
| .... | | 7/16/98 | 9/18/98 |
| ...... |  |  |  |
| SECTION 688 - MICROCOMPUTER SYSTEM |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 10/13/99 | 12/31/99 |
| ...... | . | . | . |
| SECTION 692 - SHOULDER RELIEF JOINT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
 | | 7/16/98 | 9/18/98 |
| ...... |  |  |  |
| SECTION 696 - TEMPORARY IMPACT ATTENUATING DEVICES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 11/23/99 | 2/25/00 |
| ...... | . | . | . |
| SECTION 697 - RESET TEMPORARY IMPACT ATTENUATING DEVICES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 11/23/99 | 2/25/00 |
| ...... | . | . | . |
| SECTION 702 - BITUMINOUS MATERIAL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
 | | 7/16/98 | 9/18/98 |
| ...... |  |  |  |
| SECTION 703 - AGGREGATE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
| .. | | 10/14/97 | 12/18/97 |
 | | 6/23/97 | 8/27/97 |
 | | 11/22/96 | 1/15/97 |
 | | 8/2/96 | 10/2/96 |
| ...... |  |  |  |
| SECTION 704 - CEMENT CONCRETE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 7/30/99 | 10/22/99 |
| . | | 4/28/99 | 6/24/99 |
| .. | | 5/11/98 | 6/26/98 |
| .. | | 7/17/97 | 9/25/97 |
| .. | | 9/30/96 | 12/11/96 |
| .. | | 3/13/96 | 3/13/96 |
| . |  |  |  |
| SECTION 705 - JOINT MATERIAL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 11/23/99 | 2/25/00 |
| . | | 7/30/99 | 10/22/99 |
| .. | | 8/21/98 | 11/13/98 |
| .. | | 3/3/98 | 5/8/98 |
| .. | | 6/6/97 | 8/13/97 |
| .. | | 1/24/97 | 3/12/97 |
| .. | | 12/13/96 | 2/12/97 |
| .. | | 3/13/96 | 3/13/96 |
| ...... |  |  |  |
| SECTION 709 - REINFORCEMENT STEEL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 10/13/99 | 12/31/99 |
| .. | | 10/19/98 | 2/26/99 |
| .. | | 3/30/98 | 5/22/98 |
| .. | | 12/13/96 | 2/12/97 |
| ...... |  |  |  |
| SECTION 711 - CONCRETE CURING MATERIAL AND ADMIXTURES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 9/30/96 | 12/11/96 |
| ...... |  |  |  |
| SECTION 714 - PRECAST CONCRETE PRODUCTS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| .. | | 1/28/99 | 4/22/99 |
| ... | | 2/6/98 | 4/9/98 |
| ... | | 7/17/97 | 9/25/97 |
| ... | | 12/13/96 | 2/12/97 |
| ... | | 3/13/96 | 3/13/96 |
| ...... |  |  |  |
| SECTION 724 - POZZOLANS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
| ... | | 7/1/96 | 9/18/96 |
| ...... |  |  |  |
| SECTION 735 - GEOTEXTILES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 3/13/96 | 3/13/96 |
| ...... |  |  |  |
| SECTION 802 - TOPSOIL FURNISHED AND PLACED |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 9/30/96 | 12/11/96 |
| ...... |  |  |  |
| SECTION 804 - SEEDING AND SOIL SUPPLEMENTS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 1/6/98 | 3/19/98 |
| ...... |  |  |  |
| SECTION 805 - MULCHING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 1/6/98 | 3/19/98 |
| .. | | 7/17/97 | 9/25/97 |
| ...... |  |  |  |
| SECTION 806 - WATER COURSE AND SLOPE EROSION PROTECTION |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 1/6/98 | 3/19/98 |
| ... | | 7/17/97 | 9/25/97 |
| ...... |  |  |  |
| SECTION 808 - PLANTS, PLANTING, AND TRANSPLANTING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 1/6/98 | 3/19/98 |
| .. | | 7/17/97 | 9/25/97 |
| ...... |  |  |  |
| SECTION 901 - MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 7/16/98 | 9/18/98 |
| ... | | 2/18/97 | 5/7/97 |
| .. | .. | .. | .. |
| SECTION 910 - HIGHWAY LIGHTING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 1/28/99 | 4/22/99 |
| ... | ... | ... | ... |
| SECTION 930 - POST MOUNTED SIGNS, TYPE A |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| ... | | 5/5/97 | 7/30/97 |
| ...... |  |  |  |
| SECTION 934 - POST MOUNTED SIGNS, TYPE E |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 8/21/98 | 11/13/98 |
| ...... |  |  |  |
| SECTION 1001 - CEMENT CONCRETE STRUCTURES |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 10/13/99 | 12/31/99 |
| .. | | 3/28/97 | 6/18/97 |
| .. | | 7/1/96 | 9/18/96 |
| ...... |  |  |  |
| SECTION 1002 - REINFORCEMENT BARS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 3/3/98 | 5/8/98 |
| ...... |  |  |  |
| SECTION 1013 - ALUMINUM BRIDGE RAILING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
... | | 2/6/98 | 4/9/98 |
| ...... |  |  |  |
| SECTION 1023 - ALUMINUM BRIDGE HAND RAILING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 2/6/98 | 4/9/98 |
| ...... |  |  |  |
| SECTION 1025 - MODIFICATION OF EXISTING PARAPETS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
 | | 3/28/97 | 6/28/97 |
| ...... |  |  |  |
| SECTION 1026 - NEOPRENE STRIP SEAL DAM |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
... | | 10/19/98 | 2/26/99 |
| ...... |  |  |  |
| SECTION 1040 - CONCRET BRIDGE DECK REPAIR |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 3/28/97 | 6/18/97 |
| ...... |  |  |  |
| SECTION 1050 - STEEL BRIDGE SUPERSTRUCTURE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
. | | 9/30/96 | 12/11/96 |
| ....... | | 7/1/96 | 9/18/96 |
| ...... | ...... | ...... | ...... |
| SECTION 1051 - DOWNSPOUTING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 7/30/99 | 10/22/99 |
| . | | 4/28/99 | 6/24/99 |
| ...... | ...... | ...... | ...... |
| SECTION 1060 - PAINTING STRUCTURAL STEEL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 3/30/98 | 5/22/98 |
| ...... |  |  |  |
| SECTION 1070 - PAINTING EXISTING STRUCTURAL STEEL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
... | | 3/30/98 | 5/22/98 |
| ..... | ..... | ..... | ..... |
| SECTION 1080 - PRESTRESSED CONCRETE BRIDGE SUPERSTRUCTURE |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| .. | | 7/30/99 | 10/22/99 |
| .. | .. | .. | .. |
| SECTION 1085 - PRECAST REINFORCED CONCRETE BOX CULVERT |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 3/28/97 | 6/18/97 |
.. | | 3/13/96 | 3/13/96 |
| ...... |  |  |  |
| SECTION 1086 - SOUND BARRIERS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 10/19/98 | 2/26/99 |
.. | | 2/6/98 | 4/9/98 |
.. | .. | .. | .. |
| SECTION 1101 - HIGHWAY LIGHTING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 1/28/99 | 4/22/99 |
.. | .. | .. | .. |
| SECTION 1102 - SIGN LIGHTING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 1/28/99 | 4/22/99 |
.. | .. | .. | .. |
| SECTION 1103 - TRAFFIC SIGNING AND MARKING |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
.. | | 8/21/98 | 11/13/98 |
| ...... |  |  |  |
| SECTION 1105 - FABRICATED STRUCTURAL STEEL |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
... | | 6/23/98 | 9/4/98 |
... | | 6/23/97 | 8/27/97 |
... | | 5/5/97 | 7/30/97 |
... | | 10/11/96 | 1/15/97 |
... | | 7/1/96 | 9/18/96 |
| ...... |  |  |  |
| SECTION 1107 - PRESTRESSED CONCRETE BRIDGE BEAMS |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
| . | | 4/28/99 | 6/24/99 |
.. | | 3/30/98 | 5/22/98 |
.. | | 7/24/97 | 9/25/97 |
.. | | 3/21/97 | 6/4/97 |
| ...... |  |  |  |
| SECTION 1109 - GUIDE RAIL AND METAL MEDIAN BARRIER |
| ... | "C" LTR NO. | ISSUED | EFFECTIVE |
. | | 6/6/97 | 8/13/97 |
. | | 12/13/96 | 2/12/97 |