SECTION 802 — TOPSOIL FURNISHED AND PLACED


802.1 DESCRIPTION — This work is the furnishing and placing of topsoil from outside the project, as indicated.

802.2 MATERIAL — Section 801.2 and containing not less than 2.0% nor more than 10.0% organic matter, as determined in accordance with AASHTO-Tl94. Certify as specified in Section 106.03(b)3.
Provide topsoil meeting the following grading analysis:


Sieve Minimum Percent Passing
2"100
No. 4 75
No. 10 60

Sand, silt, and clay material passing the No. 10 sieve, as defined by PTM No. 103, and within the following ranges:


Minimum PercentMaximum Percent
Sand570
Silt 1070
Clay 536
Most Current Supplement

BACK TO TABLE OF CONTENTS