PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
ENGINEERING DISTRICT 6-0
TRAFFIC RESTRICTION BULLETIN


(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)
(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

For current traffic and travel conditions, visit 511PA

PENNDOT ROADWAY MAINTENANCE HOTLINE: 1-800-FIX- ROAD

[PHILADELPHIA]    [BUCKS]    [CHESTER]    [DELAWARE]    [MONTGOMERY]   [ALL


previous next
Marshallton/Thorndale Rd., Caln Twp.Paving: LANE RESTRICTIONS between Bus. US 30 & Boulder Drive. 8 AM - 4 PM.  6/3/15-6/4/15  PennDOT  
Media Rd., E. Nottingham Twp.Shoulder Cutting: LANE RESTRICTIONS between Barnsley Chrome Rd. & PA 472. 8 AM - 2 PM.  6/2/15-6/4/15  Maintenance  
New St., Spring City Bor.Utility Installation: LANE RESTRICTIONS between N. Penn St. & Church St. 9 AM - 3 PM.  6/2/15-6/9/15  PECO Energy  
Chrome Rd., E. Nottingham Twp.Shoulder Cutting: LANE RESTRICTIONS between PA 272 & State Rd. 8 AM - 2 PM.  6/1/2015  Maintenance  
Cypress St., Kennett Square Bor.Traffic Signal Installation: LANE CLOSURES at Mill Rd; Meredith St. & South Broad St. 7 AM - 3:30 PM.  6/1/15-6/5/15  Lenni Electric Corporation  $1.2 million
E. Reeceville Rd., East Brandywine Twp.Paving: LANE RESTRICTIONS between Manor Rd. & Bondsville Rd. 8 AM - 4 PM.  6/1/15-6/2/15  PennDOT  
PA 3 E & W (West Chester Pike), Willistown, Westtown, East Goshen, West Goshen twps.Crack Sealing: INTERMITTENT LANE CLOSURES between Matlack St. & Delchester Rd. 8 AM - 2 PM.  6/1/15-6/5/15  Maintenance  
PA 401 E & W (Conestoga Rd.), East Nantmeal Twp. Patching: LANE RESTRICTIONS between PA 345 & PA 100. 8 AM - 2 PM.  6/1/15-6/3/15  Maintenance  
State St., Kennett Square Bor.Traffic Signal Installation: LANE CLOSURES at Broad St.; Union St. & Mill Rd. 7 AM - 3:30 PM.  6/1/15-6/5/15  Lenni Electric Corporation  $1.2 million
Union St., Kennett Square Bor.Traffic Signal Installation: LANE CLOSURES at South St. 7 AM - 3:30 PM.  6/1/15-6/5/15  Lenni Electric Corporation  $1.2 million
US 1 N & S (Kennett-Oxford Bypass), New Garden, Kennett twps.Guide Rail Installation: LANE RESTRICTIONS between Newark Rd. & E. Baltimore Pike. 9 AM - 3 PM.  6/1/15-6/5/15  Morgan Rail, Inc.  
US 30 E & W, Exton Bypass/Coatesville-Downingtown Bypass, West Sadsbury, Valley, Caln, East Caln, West Whiteland twps.Street Sweeping: INTERMITTENT LANE CLOSURES between Lancaster County line & US 202. 9 AM - 2:30 PM.   6/1/15-6/4/15  Maintenance  
*PA 100 N & S, (Pottstown Pike), Uwchlan, West Whiteland twps.Road Widening: LANE CLOSURES between Sunrise Drive & PA 113. 9 AM - 3 PM.  6/1/15-6/5/15  Allan A. Myers  $17.4 million
*PA 100 South, Upper Uwchlan Twp.Core Boring: LANE RESTRICTIONS between E. Township Line Rd. & Pennsylvania Drive. 9 AM - 3 PM.  6/1/15-6/5/15  Pennsylvania Turnpike  
Honey Brook, Wallace, West Brandywine, West Caln, Valley, Coatesville twps.Line Painting: SLOW MOVING OPERATION to paint lines on state highways. MOTORISTS ARE ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND INE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 2:30 PM.  5/30/15-6/5/15  PennDOT  
Planebrook Rd., East Whiteland Twp.Overhead Bridge Construction: LANE CLOSURES POSSIBLE between US 30 (Lancaster Ave.) & Swedesford Rd. 9 AM - 3 PM & 8 PM - 5 AM. 10-15 MINUTE STOPPAGES ARE ALSO POSSIBLE.   5/30/15-6/6/15  Allan A. Myers  $63.3 million
*US 422 East, North Coventry Twp.Road Construction: LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 9 AM - 2 PM.  5/30/15-6/26/15  J.D. Eckman, Inc.  $73.3 million
*US 422 West, North Coventry Twp.Road Construction: LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7 PM - 1 PM.  5/30/15-6/26/15  J.D. Eckman, Inc.  $73.3 million
PA 724 ramp to US 422 East, E. Coventry Twp.Ramp/Bridge Construction: RAMP CLOSED & DETOURED. DETOUR POSTED.  5/27/15-3/2018  J.D. Eckman, Inc.  $73.3 million
Pottstown Pike, South Coventry Twp.Paving: LANE RESTRICTIONS between PA 23 (Ridge Rd.) & Fairview St. 8 AM - 4 PM.  5/27/15-5/30/15  PennDOT  
Linfield Rd., East Coventry Twp.Bridge Rehabilitation: CLOSED & DETOURED between PA 724 (New Schuylkill Rd.) & Limerick Center Rd. 24-HOUR CLOSURE. DETOUR POSTED.  5/13/15-11/30/15  J.D. Eckman, Inc.  $6 million
Boot Rd., West Goshen Twp.Road Widening: LANE RESTRICTIONS between Clover Mill Rd. & National Rd. Weekdays 9 AM - 3 PM.  5/11/15-7/31/15  J.Lowe, Assoc.  
Newtown Rd., Easttown Twp.Utility Installation: CLOSED & DETOUR between Sugartown Rd. & Waterloo Rd. 9 AM - 3 PM. DETOUR POSTED.  5/6/15-6/12/15  Aqua Pennsylvania  
Valley Forge Rd., Schuylkill Twp.Utility Installation: CLOSED & DETOURED between Country Club Rd. & Reservoir Dam. 7 AM - 5 PM. DETOUR ALREADY IN PLACE.  5/4/15-8/21/15  Aqua Pennsylvania  
Newtown Rd., Easttown Twp.Utility Installation: CLOSED & DETOURED between Sugartown Rd. & Waterloo Rd. 9 AM - 3 PM. DETOUR POSTED.  4/29/15-6/12/15  Aqua Pennsylvania  
*PA 23 (Valley Forge Rd.), Schuylkill Twp.Bridge Rehabilitation: CLOSED & DETOURED between Moorehall Drive & McAvoy Lane. 24-HOUR DETOUR. DETOUR POSTED.  4/20/15-12/2015  J.D. Eckman, Inc.  $1.7 million
US 322 (Horse Shoe Pike), Honey Brook Twp.Bridge Construction: LANE CLOSURE between PA 10 & PA 82. 24-HOUR RESTRICTION.   3/9/15-9/2015  J.D. Eckman, Inc.  $1.3 million
*US 422 E & W, North Coventry Twp.Bridge Replacement: REDUCED TO ONE LANE between Stowe & PA 100 Interchanges.   11/27/14-9/2018  J.D. Eckman, Inc.  $36 million
Burnt Mill Rd., Kennett Twp.Bridge Damage: CLOSED & DETOURED between Norway Rd. & Spring Mill Rd. 24 HOUR DETOUR. DETOUR POSTED.  4/25/14-Indef.  PennDOT  
*US 202 N & S, East Whiteland Twp.Road Reconstruction/Widening: TRAFFIC PATTERN SHIFT between PA 401 & US 30 Interchanges.   4/1/2014-8/2016  Allan A. Myers  $63.4 million



previous next