PENNSYLVANIA DEPARTMENT OF TRANSPORTATION
ENGINEERING DISTRICT 6-0
TRAFFIC RESTRICTION BULLETIN


(NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS)
(All restrictions 24 hours/day, 7 days/week unless otherwise noted)

For current traffic and travel conditions, visit 511PA

PENNDOT ROADWAY MAINTENANCE HOTLINE: 1-800-FIX- ROAD

[PHILADELPHIA]    [BUCKS]    [CHESTER]    [DELAWARE]    [MONTGOMERY]   [ALL


previous next
Hide details for PhiladelphiaPhiladelphia
*PA 611 N & S (Broad St.)Foundation Excavation/Light/Tree Bed Installation: LEFT LANE CLOSED between Glennwood Ave. & Spring Garden St. Friday 7 PM thru Monday 5 AM.  10/24/14-10/27/14  Tony DePaul & Son  $8.6 million
*I-95 NorthBridge Inspection: LEFT LANE CLOSED between I-676 & Girard Ave. 9 AM - 12 PM.  10/23/2014  Dawood Engineering, Inc.  
*I-95 SouthBridge Inspection: LEFT LANE CLOSED between I-676 & Washington Ave. 12 PM - 3 PM.  10/23/2014  Dawood Engineering, Inc.  
*I-676 East on-ramp to I-95 SouthDeck Repair: RAMP CLOSED. 9 PM - 5 AM. DETOUR POSTED.  10/22/2014  Maintenance  
*I-95 NorthBridge Inspection: RIGHT LANE CLOSED betweenI-676 & Girard Ave. 9 AM - 12 PM.  10/22/2014  Dawood Engineering, Inc.  
*I-95 SouthBridge Inspection: RIGHT LANE CLOSED between I-676 & Girard Ave. 12 PM - 3 PM.  10/22/2014  Dawood Engineering, Inc.  
Betsy Ross Bridge off-ramp to I-95 North off-rampExpansion Joint Repair: LANE CLOSURES on ramp. 9 AM - 3 PM.  10/21/14-10/24/14  IEW Construction Group, Inc.  $21.6 million
Richmond St./Delaware Ave. on- ramp to I-95 NorthBarrier Removal: RAMP CLOSED & DETOURED. 9 PM - 1 AM. DETOUR POSTED.  10/21/2014  James J. Anderson  $211.7 million
*I-95 North of- ramp to I-676 WestBridge Inspection: SHOULDER CLOSED ON RAMP. 9 AM - 1 PM.  10/21/2014  Dawood Engineering, Inc.  
*I-95 North of-f ramp to North 3rd St.Bridge Inspection: SHOULDER CLOSED ON RAMP. 1 PM - 3 PM.  10/21/2014  Dawood Engineering, Inc.  
84th St.Crack Sealing: LANE RESTRICTIONS between Darby Creek Bridge & Bartram Ave. 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
B StreetPavement Marking Installation: LANE RESTRICTIONS between Allegheny Ave. & Erie Ave. 9:30 AM - 3:30 PM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
Cecil B. Moore Ave.Crack Sealing: LANE RESTRICTIONS between Ridge Ave. & 10th St. 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
Delaware Ave. Utility Work: LANE CLOSURE between Columbia Ave. & Berks St. 7 AM - 3 PM.  10/20/14-10/24/14  James J. Anderson  $211.7 million
Frankford Ave.Milling: LANE RESTRICTIONS between Torresdale Ave. & Robbins St. 9:30 AM - 3:30 PM & 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
Island Ave.Crack Sealing: LANE RESTRICTIONS between Bartram Ave. & Elmwood Ave. 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
New State Rd.Slope Maintenance: LANECLOSURE between Milnor St. & Princeton Ave. 9 AM - 3 PM.  10/20/14-10/25/14  Walsh Construction Company  $212.3 million
Passyunk Ave.Roadwork: LANE RESTRICTIONS between Essington Ave. & 28th St. 9:30 AM - 3:30 PM & 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
Penn SquareCrack Sealing: LANE RESTRICTIONS between Juniper St. & Broad St. 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
Rhawn St.Paving: LANE RESTRICTIONS between US 1 (Roosevelt Blvd.) & State Rd. 9:30 AM - 3:30 PM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
Roberts Ave.Roadwork: LANE RESTRICTIONS between Henry Ave. & Germantown Ave. 9:30 AM - 3:30 PM & 7 PM - 5 AM.  10/20/14-10/24/14  James J. Anderson  $9.3 million
State Rd.Sidewalk Installation: LANE CLOSURES between Wellington St. & Bleigh Ave. 9 AM - 3 PM.  10/20/14-10/26/14  Walsh Construction Company  $212.3 million
S. Delaware Ave.Conduit Installation: LANE RESTRICTIONS between E. Columbia Ave. & E. Palmer St. 7 AM - 3 PM.  10/20/14-10/24/14  PECO Energy  
US 1 South (Roosevelt Blvd.)Milling & Paving: INSIDE LANES CLOSED between Cottman Ave. & 9th St. 7 PM - 6 AM.  10/20/14-10/24/14  Tony DePaul & Son  $5.9 million
US 1 (City Ave.)ADA Ramp Installation: LANE RESTRICTIONS at Greenhill Rd., 66th St, & 71st St. 9 AM - 3 PM.  10/20/14-10/24/14  James J. Anderson  $2,888,262.
US 1 (Roosevelt Blvd.) NorthTraffic Signal Maintenance: RIGHT LANE CLOSED between Ryan Ave. & Strahle St. 9 AM - 3 PM.  10/20/14-10/24/14  Buckley & Company, Inc.  $15.5 million
US 1 (Roosevelt Blvd.) SouthTraffic Signal Maintenance: RIGHT LANE CLOSED between Strahle St. & Rhawn St. 9 AM - 3 PM.  10/20/14-10/24/14  Buckley & Company, Inc.  $15.5 million
*I-676 E & WDrain Cleaning/Debris Removal: LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM.  10/20/14-10/23/14  Maintenance  
*I-76 E & WDrain Cleaning/Debris Removal: LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM.  10/20/14-10/23/14  Maintenance  