Contract Number:24683
Project Name :Dougherty's Mills Bridge
SR (Sec) : 0173 (250)
County :Butler
Municipality : Slippery Rock Twp

Project Designer :Gannett Fleming

Project Description :
This project is for the replacement of the existing concrete arch bridge which carries traffic from PA-173 (Centreville Pike) over Slippery Rock Creek in the village of Doughtery's Mills (Slippery Rock Twp) with a two-lane single-span Steel-Girder Bridge. The existing bridge, located approximately 2 miles south of Slippery Rock University, was built in 1929 as an two-lane 140'-long concrete/arch roadway bridge and sees an average daily traffic of approximately 6370 vehicles and also has a pedestrian walkway on one side.

Work to be performed includes: removal/demolition of existing structure, replacement bridge construction, approach work, drainage, guide rail installation, culvert extension, removal and relocation of aerial utilities, and related miscellaneous construction

Drivers and pedestrians should expect bridge closures and a detour route will be in place. For more information on the detour route, please see the Schedule and Restrictions and Detour Map links to the left for current project information. Construction is expected to be completed by 08/17/2011.

Motorists are advised to anticipate traffic delays and be prepared to stop. Motorists are also asked to turn on headlights, slow down, and exercise caution when traveling through work zones. As the need applies, flag crews will direct traffic while work is being performed.


Assistant Construction Engineer:Brian Steffy
Project Inspector-in-charge :Tim Acken

Consultant Inspection on Project?
Yes
If Yes, Consultant Firm :
TRC Engineers, Inc.

Prime Contractor :Mekis Construction Corp.
Field Superintendent :Steve Reed
Actual Notice to Proceed Date :12/19/2010
Anticipated Completion Date :08/17/2011
Construction Cost :$2,822,687