Statewide Airport System Plan

Please note: To decrease file size, enabling faster download, some of the chapters were separated into several pdf files.

2002 Statewide Airport System Plan

Introduction to the Statewide Airport System Plan (202 kb)

Chapter 1--System Performance Criteria (255 kb)

Chapter 2--Inventory: Contact the Bureau of Aviation at 717-705-1260 for updated inventory information.

Chapter 3--Airport Roles (831 kb))

Chapter 4--U.S. Airline Industry Trends and Projections
    Industry Trends (438 kb)
    Projections of Pennsylvania Aviation Demand
          Forecast Assumptions (1.4 mb)
          Based Aircraft Projections (419 kb)
          Total Aircraft Operations Projections (5.2 mb)

Chapter 5--System Adequacy Analysis (2.2 mb)
    Maps and Tables (7.6 mb)

Chapter 6--Options Identification
    Activity/Demand (2.5 mb)
    Accessibility; Support/Committment; Facilities; Optimization Potential; Next Steps (1.2 mb)

Chapter 7--System Coverage Performance
    System Coverage Performance (Maps not shown) (338 kb)
    Potential Impact to Future System Coverage Performance (2.7 mb)
    System Coverage Performance Analysis; Summary (590 kb)

Chapter 8--System Recommendations (2.21 mb)

Chapter 9--Sensitivity Analysis (575 kb)

Chapter 10--Recommended Infrastructure Development Plan (1 mb)

All documents are in Adobe PDF format. To read or print any of these documents, you MUST have PDF viewing software. This software is FREE! If you do not have the Adobe Acrobat software necessary to view this newsletter, please follow link to Adobe.com.